Healthy Building Case Studies – AET Flexible Space

Healthy Buildings

Our systems promote excellent Indoor Air Quality and personal comfort, actively contributing to healthy indoor environments.

View Categories

SAS Marlow

Since the installation of AET’s UfAC system and completion of the fit-out works, SAS’s staff have been able to move back into their new office environment. Many of them have already commented on the vastly improved working conditions.

Refurbishment

Majid Al Futtaim Tower 2

Sustainable office headquarters for Majid Al Futtaim Properties LLC

New Build

University of Essex

The client preferred a flexible system which would satisfy both high and transient occupancy levels and adapt to future change of use within the space.

New Build

Sky Central Campus

AET Flexible Space Fantiles were specified by Arup to provide additional airflow and user control for approximately 40 modular meeting room pods located within the 45,000 sq m campus.

New Build

Jaguar Land Rover Manufacturing Plant

AET Fantiles with additional electric trim heaters offered the same performance as trench heating system, but with much greater flexibility.

New Build

Parkview Green FangCao Di

The design objective was to create a benchmark for a technologically advanced building that would provide energy efficient solutions for the developer, owner and occupiers

New Build

Nina Tower

AET Flexible Space Hong Kong designed, supplied and installed the complete AET Flexible Space UfAC system

New Build

Manchester Civil Justice Centre

Multi-Award Winning £113 million Manchester Civil Justice Centre

New Build

Microsoft Shanghai

A five storey new build construction for Microsoft Zizhu Campus in Shanghai, China

New Build

Jaguar Land Rover Design Centre

This project is an excellent example of how UfAC systems can adapt easily to fast changing requirements of high density office environments

New Build

The Center, Hong Kong

Hong Kong’s 5th Tallest Skyscraper featuring AET Flexible Space

New Build

Shanghai International Port Cruise Terminal

12 Buildings of Speculative Offices at Shanghai International Port Cruise Terminal

New Build

Agora Gazetta Poland

New Build Headquarters for Agora Gazetta Poland featuring 14,500 sq m of AET Flexible Space Underfloor Air Conditioning

New Build

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.