AET Flexible Space | Underfloor Air Conditioning Fit-out and Maintenance

Fitout & Maintenance

Underfloor air conditioning can easily accommodate workplace changes due to the modular, flexible design and with the trend of office and tenant leases becoming increasingly shorter term, lease renewal and refurbishment is often preferred over securing new lease terms and moving to new space. The Flexible Space system is the ideal solution to meet the demands of today’s agile workspace.

Cat-A to Cat-B fit-out works are simple and cost effective using underfloor air conditioning compared to traditional ceiling based systems. Easily reconfigure workspace and accommodate layout changes.

Take a look at the videos to see this flexibility in action:

Fitout & Maintenance


The videos below show how office and workspace is easily changed from CAT A speculative space to CAT B occupied space.

CAM-C System

Fully Underfloor, Supply and Return Air

CAM-V System

Underfloor Supply Air, High Level Return Air

AET offer preventative and reactive service and maintenance and fit-out works for existing AET Flexible Space installations, including:

  • CAT-A to CAT-B fit-out works for incoming tenants, transforming the internal space to a finished space ready for occupation
  • CAT-B to CAT-A fit-out works for outgoing tenants, who have to return the interior space back to the bare state prior to occupation.
  • Commissioning – to verify system performance against the design and specification.
  • Full surveys of the underfloor plenum to identify problem areas which may affect system operation
  • Service plans from 1 year to 3 years
  • Spare parts and additional or replacement units
  • AC to EC fan upgrades for CAM downflow units
  • Controls upgrades for existing systems
  • Re-commissioning after fit-out works have been carried out

 

Contact us to discuss your Fit-out and Maintenance requirements


Fitout Case Studies


Morgan Lovell
View

Morgan Lovell

17 Devonshire Square, London - December 2018

Cat-B fit-out of the 2nd floor at 17 Devonshire Square for the Transport Salaried Staffs’ Association (TSSA)

Modus Workspace
View

Modus Workspace

33 Glasshouse Street, London September 2018

Cat-B fit-out of 2nd, 3rd and 5th floor workspace at 33 Glasshouse Street for new incoming tenant, one of the world’s biggest tech giants.

Maris Interiors
View

Maris Interiors

6 Warwick Street, London July 2018

Cat-B fit-out of 4th floor workspace for new incoming tenant, pulp and paper specialists, Pulp Mill Trading Co. Ltd.

Loop Interiors LLP
View

Loop Interiors LLP

180 Great Portland Street – 5th Floor, London July 2018

Cat-B fit-out of 5th floor workspace for new incoming tenant

Twenty1 Construction Ltd
View

Twenty1 Construction Ltd

77-79 Farringdon Road, London July 2018

Refurbishment and upgrade of existing underfloor air conditioning system

Overbury Plc
View

Overbury Plc

8 Waterloo Place - 2nd floor, London May 2018

High specification Cat-B fit-out for incoming tenant, private wealth management company.

Grosvenor Securities Ltd
View

Grosvenor Securities Ltd

16-18 Kirby Street - 1st floor, London April 2018

Full renovation and upgrade of existing underfloor air conditioning system.

Think-Inside FM
View

Think-Inside FM

11-12 Hanover Street – 1st Floor, London - April 2018

Cat-B Fit-out of 1st floor for new incoming tenant Quadreal.

Axil Advisors LLP
View

Axil Advisors LLP

Savile Row – 5th Floor, London 2017

Cat-B fit-out works carried out for 5th floor tenant, Axil Advisors LLP.

EG Capital
View

EG Capital

Savile Row – 3rd Floor, London April 2017

Equipment upgrade and reconfiguration works carried out on behalf of Overture for 3rd floor tenant, EG Capital.

G Square Capital
View

G Square Capital

Savile Row – 2nd Floor, London May 2017

Equipment upgrade and reconfiguration works carried out on behalf of interior Property Solutions.

Amadeus
View

Amadeus

First Point - 3rd Floor, Gatwick April 2017

Working with M&E specialist Callisia, AET carried out a full system survey and subsequent upgrade and reconfiguration.

Focus Point
View

Focus Point

Focus Point - 3rd floor, Kings Cross, London

Supply and installation of 8 Flextouch wall controllers for meeting rooms

Working Environments Ltd
View

Working Environments Ltd

Focus Point – 2nd and 3rd Floors, London 2017

AET supplied and installed 85 TU4-EC Fantiles and 4 Flexgateway communication modules

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.