Case Study
Total Area
2,800 sq m
System
Central AHU and Fantiles2018 New Build
Leading car manufacturer BMW have recently moved into new offices in one of the mixed-use buildings at the White Magnolia Plaza, Shanghai. The mixed use development consists of a 320m office high rise, a hotel tower as well as a series of smaller scale buildings. The complex is part of a neighbourhood redevelopment plan along the Huangpu River.
123 TU4 Fantile units were supplied for the BMW office areas to enhance air conditioning performance. The Fantile system was chosen due its’ flexibility, ease of installation and efficient air distribution, as well as the ability to maximise headroom in the workspace. The Fantile system is connected to the BMS using an AET Flexgateway module.
Architect – Skidmore, Owings & Merrill
Developer – Sinar Mas Group – APP China
End User – BMW China Services Ltd
Case Study PDFs
Contact us at sales@flexiblespace.com to request PDF case studies
Bridge House
Completed in April 2022, this extensive refurbishment
of Grade II listed building Bridge House will create
light, and airy contemporary CAT-A office space which
will incorporate AET’s innovative and highly adaptive
underfloor air conditioning (UfAC) system across all five
floors.
The Gilbert & One Lackington
Designed as a private members club, in 1930, by Frederick Gould and Giles Gilbert Scott, designer of the iconic British red telephone box, Citygate House has been lovingly restored to its former glory and returned to its original name, The Gilbert.
Refurbishment10 St Giles Square
Part of the dramatic revival of London’s iconic skyscraper, Centre Point, this project, completed in February 2021, focused on creating the new London headquarters of Japanese developer and investor, Kajima.
London Refurbishment20 Red Lion Street
This redevelopment of an existing five-storey 1950’s office building in the heart of Holborn, includes a single-storey extension to the roof, an extension to the office plate to the rear by 3.5m, and an extensive internal reconfiguration.
RefurbishmentContact us to discuss your HVAC requirements
See how UfAC can speed up construction time, reduce costs and create space.