11-12 Hanover Street — AET Flexible Space

Case Study

| all |

11-12 Hanover Street

London, UK

Underfloor air conditioning and Nesite raised access flooring was supplied to this building in 2000 as part of a full refurbishment for Japanese developer, Taisei

Total Area

483 sq m

System
CAM-C Underfloor supply air, underfloor return air

2000 Refurbishment

Underfloor air conditioning and Nesite raised access flooring was supplied to this building in the year 2000 as part of a full refurbishment for Japanese developer, Taisei.

The building is situated in the heart of Mayfair in a prominent location on the corner of Hanover Street and Pollen Street and features floor to ceiling glazing, granting excellent natural light and a generous 2.7m floor to ceiling height.

5 CAM-C25 units and approximately 80 standard TU4 Fantiles are installed over the 5 floors.

Architect = D.E.G.W.

Consultant = Roger Preston

Main Contractor = M J Gleeson

M & E Contractor = F W Cook


Case Study PDFs

Contact us at sales@flexiblespace.com to request PDF case studies

Bridge House

Completed in April 2022, this extensive refurbishment
of Grade II listed building Bridge House will create
light, and airy contemporary CAT-A office space which
will incorporate AET’s innovative and highly adaptive
underfloor air conditioning (UfAC) system across all five
floors.

Refurbishment

The Gilbert & One Lackington

Designed as a private members club, in 1930, by Frederick Gould and Giles Gilbert Scott, designer of the iconic British red telephone box, Citygate House has been lovingly restored to its former glory and returned to its original name, The Gilbert.

Refurbishment

10 St Giles Square

Part of the dramatic revival of London’s iconic skyscraper, Centre Point, this project, completed in February 2021, focused on creating the new London headquarters of Japanese developer and investor, Kajima.

London Refurbishment

20 Red Lion Street

This redevelopment of an existing five-storey 1950’s office building in the heart of Holborn, includes a single-storey extension to the roof, an extension to the office plate to the rear by 3.5m, and an extensive internal reconfiguration.

Refurbishment

Contact us to discuss your HVAC requirements

See how UfAC can speed up construction time, reduce costs and create space.