Case Study
Total Area
15,000 sq m
System
AET Flexible Space CAM-C Under Floor Supply, Under Floor Return Air2004 - 2016 Refurbishment
Complete refurbishment of multi-let, 12 storey office building with new undercroft reception and breakout area
AET Flexible Space Underfloor Air Conditioning was offered as a potential solution to the restrictive 2.8m slab height which could cause problems in providing thermal comfort to meet tenants expectations. The existing perimeter fan coil units had reached the end of their life and their position restricted flexible deeper plan layouts
Low energy comfort cooling and heating is now offered throughout, with the increased headroom fundamental for letting agents and investors seeking high quality space. The floor plenum is reduced to 175 mm, and the ceiling void reduced to 80 mm, resulting in a floor to ceiling height of 2.5 m
Developer – Commercial Estates Group
Consultant – Andrew Wilkes Management
Architect – TDA
Case Study PDFs
Contact us at sales@flexiblespace.com to request PDF case studies
Bridge House
Completed in April 2022, this extensive refurbishment
of Grade II listed building Bridge House will create
light, and airy contemporary CAT-A office space which
will incorporate AET’s innovative and highly adaptive
underfloor air conditioning (UfAC) system across all five
floors.
The Gilbert & One Lackington
Designed as a private members club, in 1930, by Frederick Gould and Giles Gilbert Scott, designer of the iconic British red telephone box, Citygate House has been lovingly restored to its former glory and returned to its original name, The Gilbert.
Refurbishment10 St Giles Square
Part of the dramatic revival of London’s iconic skyscraper, Centre Point, this project, completed in February 2021, focused on creating the new London headquarters of Japanese developer and investor, Kajima.
London Refurbishment20 Red Lion Street
This redevelopment of an existing five-storey 1950’s office building in the heart of Holborn, includes a single-storey extension to the roof, an extension to the office plate to the rear by 3.5m, and an extensive internal reconfiguration.
RefurbishmentContact us to discuss your HVAC requirements
See how UfAC can speed up construction time, reduce costs and create space.