Case Study
Total Area
30,000 sq m
System
CAM-V Underfloor supply air, high level return air2013 New Build
The Korea Expressway Corporation runs the toll roads in South Korea and actively engages in the construction and maintenance of national expressways.
In 2013 underfloor air conditioning equipment was installed over nineteen floors of the new headquarters tower, over an area of approximately 24,000 sq m. A total of 38 large size CAM-V downflow units supply air at volumes of up to 16,500 m3/hour. The building also uses the AET Flexvisor monitoring system for remote monitoring and control. Underfloor systems were preferred by the client due to the height saving capabilities, flexibility and speed of installation.
AET CAM-V100 and CAM-V150 downflow units were developed specifically for this project by client request and have since become part of the AET Flexible Space extended product range.
Case Study PDFs
Contact us at sales@flexiblespace.com to request PDF case studies
Bridge House
Completed in April 2022, this extensive refurbishment
of Grade II listed building Bridge House will create
light, and airy contemporary CAT-A office space which
will incorporate AET’s innovative and highly adaptive
underfloor air conditioning (UfAC) system across all five
floors.
The Gilbert & One Lackington
Designed as a private members club, in 1930, by Frederick Gould and Giles Gilbert Scott, designer of the iconic British red telephone box, Citygate House has been lovingly restored to its former glory and returned to its original name, The Gilbert.
Refurbishment10 St Giles Square
Part of the dramatic revival of London’s iconic skyscraper, Centre Point, this project, completed in February 2021, focused on creating the new London headquarters of Japanese developer and investor, Kajima.
London Refurbishment20 Red Lion Street
This redevelopment of an existing five-storey 1950’s office building in the heart of Holborn, includes a single-storey extension to the roof, an extension to the office plate to the rear by 3.5m, and an extensive internal reconfiguration.
RefurbishmentContact us to discuss your HVAC requirements
See how UfAC can speed up construction time, reduce costs and create space.